Hi Shivraj,
Thanks for your reply.
I'm aware that I need to do the upgrade adjustment step by step, but I want to ensure that also there is always a possibility to restore if required.
----
As you have mentioned if I create a Transport in Dev system -(in my project) I need it to move to Production mandatorily (confirmed with my BASIS team).
Maybe I can use the same transport created in DEV system as a backup option. I can use it to restore in the same DEV system in case any issues.
-----
So, then I need to create 3 TR's & release at each step for upgrade in my DEV system:
1) Before starting upgrade - Transport both customer tables (can be used as a Backup)
2) After upgrade - Transport both customer tables
3) All role changes during upgrade
----
In this case - Transport 2, should completely overwrite Transport 1 in my Production and all other systems. Am I right ?
Will the above methodoly be fine for Security Upgrade?
Cheers,
Srini.