Re: SU24 Customer Data Upload Issue

$
0
0

Hi Shivraj,

 

Thanks for your reply.

 

I'm aware that I need to do the upgrade adjustment step by step, but I want to ensure that also there is always a possibility to restore if required.

----

As you have mentioned if I create a Transport in Dev system -(in my project) I need it to move to Production mandatorily (confirmed with my BASIS team).

 

Maybe I can use the same transport created in DEV system as a backup option. I can use it to restore in the same DEV system in case any issues.

-----

So, then I need to create 3 TR's & release at each step for upgrade in my DEV system:

1) Before starting upgrade - Transport both customer tables (can be used as a Backup)

2) After upgrade - Transport both customer tables

3) All role changes during upgrade

----

In this case - Transport 2, should completely overwrite Transport 1 in my Production and all other systems. Am I right ?

 

Will the above methodoly be fine for Security Upgrade?

 

Cheers,

Srini.